| 0

Cole Technologies Group was established in a small office in Ossining, New York, with two employees; the founder and an administrative assistant.

BREAKTHROUGH

CTG won it’s first major contract, when the NYC Department of Environmental Protection assigned the complete structural evaluations of 15 bridges in the city’s watershed. In 1994,  environmental consulting was added to the company’s portfolio of services.  Two divisions were created; the Materials Technologies Division and Environmental Technologies Division.  The…Read More

GROWTH

Further growth in client base and project variety necessitate a move into even larger quarters, and several state-of-the-art labs and testing facilities were installed.

COLLABORATION

The terrorist attacks on the World Trade Center rocked New York City, lead the company to provide environmental consulting, inspections, and assessments on-site at Ground Zero for the United States Environmental Protection Agency.

EVOLUTION

A global recession hits, but Cole Technologies Group saw it’s clients through and emerged with renewed focus and energy

REINVENTION

The Company name was changed to Cole Technologies Group (CTG) to better reflect the scope of its expertise and services.

EXPANSION

A five-year period of remarkable growth culminates, and CTG expands its physical facilities yet again.

RELOCATE

CTG moves to its current location in Pelham, NY.

OUTLOOK

CTG’s stellar reputation results in becoming lead inspections agent on several prominent NYC skyline and infrastructure projects, such as One Vanderbilt Plaza in Manhattan and the Delta LaGuardia Airport reconfiguration in Queens.

Cole Technologies Group was established in a small office in Ossining, New York, with two employees; the founder and an administrative assistant.

BREAKTHROUGH

CTG won it’s first major contract, when the NYC Department of Environmental Protection assigned the complete structural evaluations of 15 bridges in the city’s watershed. In 1994,  environmental consulting was added to the company’s portfolio of services.  Two divisions were created; the Materials Technologies Division and Environmental Technologies Division.  The…Read More

GROWTH

Further growth in client base and project variety necessitate a move into even larger quarters, and several state-of-the-art labs and testing facilities were installed.

COLLABORATION

The terrorist attacks on the World Trade Center rocked New York City, lead the company to provide environmental consulting, inspections, and assessments on-site at Ground Zero for the United States Environmental Protection Agency.

EVOLUTION

A global recession hits, but Cole Technologies Group saw it’s clients through and emerged with renewed focus and energy

REINVENTION

The Company name was changed to Cole Technologies Group (CTG) to better reflect the scope of its expertise and services.

EXPANSION

A five-year period of remarkable growth culminates, and CTG expands its physical facilities yet again.

RELOCATE

CTG moves to its current location in Pelham, NY.

OUTLOOK

CTG’s stellar reputation results in becoming lead inspections agent on several prominent NYC skyline and infrastructure projects, such as One Vanderbilt Plaza in Manhattan and the Delta LaGuardia Airport reconfiguration in Queens.


.cd-h-timeline__events { position: relative; } .cd-h-timeline__event { position: absolute; z-index: 1; width: 100%; left: 0; top: 0; transform: translateX(-100%); opacity: 0; animation-duration: 0.4s; animation-timing-function: ease-in-out; } .cd-h-timeline__event–selected { // selected event info position: relative; z-index: 2; opacity: 1; transform: translateX(0); } .cd-h-timeline__event–enter-right, .cd-h-timeline__event–leave-right { // animate event info animation-name: cd-enter-right; } .cd-h-timeline__event–enter-left, .cd-h-timeline__event–leave-left { // animate event info animation-name: cd-enter-left; } .cd-h-timeline__event–leave-right, .cd-h-timeline__event–leave-left { animation-direction: reverse; } @keyframes cd-enter-right { 0% { opacity: 0; transform: translateX(100%); } 100% { opacity: 1; transform: translateX(0%); } } @keyframes cd-enter-left { 0% { opacity: 0; transform: translateX(-100%); } 100% { opacity: 1; transform: translateX(0%); } }
  1. Horizontal Timeline

    January 16th, 2014

    Lorem ipsum dolor sit amet, consectetur adipisicing elit. Illum praesentium officia, fugit recusandae ipsa, quia velit nulla adipisci? Consequuntur aspernatur at, eaque hic repellendus sit dicta consequatur quae, ut harum ipsam molestias maxime non nisi reiciendis eligendi! Doloremque quia pariatur harum ea amet quibusdam quisquam, quae, temporibus dolores porro doloribus.